Dated April 30, 2003
All linked files below are in Acrobat format
All linked files below are in Acrobat format
- Table of Contents
- Introduction
- Goals and Objectives of the Traffic Circulation Plan Element
- Traffic Generation and the Preservation of the Rural Residential Character of Montgomery Township
- Roadway Design Specifications
- Current Ongoing Traffic Circulation Studies
- The Current Traffic Circulation Study Area
- Current Ongoing Land Use Planning Studies
- Proposed New Roadways to Help Alleviate Traffic Congestion at the Route 206/Route 518 Intersection and Related Route 206 Corridor Improvements
- Proposed New Roadways to Help Alleviate Traffic Congestion at the Route 206 Intersection with Cherry Valley Road and Princeton Avenue and Related Route 206 Corridor Improvements
- Environmental Studies Regarding the Feasibility of Certain Roadway Construction in the Study Area
- Conclusions and Recommendations
- Addendum I [map a] [map b] [map c]
- Addendum II [appendix a] [appendix b] [appendix c] [appendix d] [appendix e] [appendix f] [appendix g] [appendix h] [maps]
- Addendum III [images a] [images b] [images c] [images d]
- Addendum IV [images a] [images b] [images c] [images d] [images e]
List of Plates
- Areas in Montgomery Township Along Route 518 Which Include Properties That Have Been the Subject of Informal Development Proposals
- Development Resulting from the Zoning of the Major Vacant Lands Along Route 518within the Route 518/Route 206 Study Area
- Proposed New Road from Orchard Road to County Route 518 and Related Route 206 Corridor Improvements
- Proposed Roads Connecting County Route 518 & US Route 206 and Related Route 206 Corridor Improvements
- Previously Proposed Road Improvements at the Route 206 Intersection with Cherry Valley Road and Princeton Avenue